Agreement Of Boat Repair

Agreement Of Boat Repair

3 Assistant Message for Small Business Your interest in a Master Ship Repair Agreement (MSRA) or Boat Repair Agreement (ABR) is appreciated. The Southwest Regional Maintenance Center (SWRMC) awards and manages ship/boat repair and new construction contracts with companies holding an MSRA or ABR from the Naval Sea Systems Command (NAVSEA). See the NavSEA Instruction C-Link on the swrmc swr™ website does not enter into direct contracts with suppliers for materials used in ship/boat repair and new construction. To apply for an MSRA or ABR, you must provide the name, address, telephone number, DUNS number, point of contact, telephone number(s) and address(es) of your company for the MSR/ABR application and for the Defense Contract Audit Agency. In addition, the Defense Federal Acquisition Regulation Supplement (DFARS) requires Department of Defense (DOD) contractors to be registered in the Central Contractor Registration (CCR) database. The CCR`s registration information can be found on the JRC website (the submission of complete applications is subject to a financial capacity audit by the Defense Contract Agency (DCAA). If the contractor`s audit is successful, the application and audit information is transmitted to NAVSEA. A NAVSEA team will conduct a certification survey at the contractor`s facility. SWRMC staff may be associated as members of the investigation team.

Submit full application: SWRMC, Attn: code 410A 3755 Brinser St., Ste 4, San Diego, CA Contractors are also encouraged to go directly to MSR/ABR companies, other contract offices or the Small Business Administration to discuss their company`s competencies. If you have any further questions, please contact me at the ADDRESS DEPUTY FOR SMALL BUSINESS Specialist or the Small Business Specialist of DEPUTY FOR SMALL BUSINESS Send the above information with the completed standard form 17, facilities for the construction or repair of ships to SWRMC, Attn: Contracts Dept. Once the application is received, one or more SWRMC representatives will re-review the application package to ensure that it is complete. Contractor 3 8 NAVSEAINST C production control. A production organization. Qualified staff. Production load control. Integration of key functions in production.

Ability to advance work efforts. Technical assistance for production. In-house or subcontracted engineering and design support functions. Control of materials/acquisitions. A material control system (purchase, monitoring, receipt, inspection, separation, distribution, non-compliance and disposal). An inventory system. Enough storage space. Subcontractor control. proof of the control capacity of the subcontractors. Quality control/testing and testing. An identified quality control system. Quality control/manual procedures.

Availability of the calibration and measurement system. Security. Designated security missions. Security procedure. Fire and safety protection. Control of hazardous substances/waste. . . .


Comments are closed.